When carrying out design and survey work at the state enterprise, it was necessary to select cabinets to accommodate 544 pressure sensors in two parts of the building (16 cabinets). The task was complicated by the need to keep within the overall dimensions of the balcony, not deep, no more than 40 cm deep (just do not open the doors). The temperature in the room can be heated above 100 C, the cabinets must have forced ventilation and be airtight.
Several different suppliers of electrical equipment were sorted out, as a result, the equipment of the CEM was chosen and procured.
We successfully disassembled it in parts, brought to a three-meter height (balcony), placed and secured. Invented how to place inside the pressure sensors, creating certain shelves under the impulse tubes to them. In general, a fairly painstaking design and installation work was carried out.
The cabinets seemed quite high quality, convenient in installation and operation. See for yourself.

























#Cabinets, #CMOs, #choices, #suppliers, #sensors, #pressures
Russian version
Several different suppliers of electrical equipment were sorted out, as a result, the equipment of the CEM was chosen and procured.
We successfully disassembled it in parts, brought to a three-meter height (balcony), placed and secured. Invented how to place inside the pressure sensors, creating certain shelves under the impulse tubes to them. In general, a fairly painstaking design and installation work was carried out.
The cabinets seemed quite high quality, convenient in installation and operation. See for yourself.

























#Cabinets, #CMOs, #choices, #suppliers, #sensors, #pressures
Russian version
Ваш комментарий добавлен