Objects


Modernization of dispatch systems for the life support systems of the building, the Golden Apple Hotel. Moscow. Changed Desigo Siemens controllers for modern domestic manufacturer Aries PLC110. SCADA visualization created on the basis of the website using the built-in cloud capabilities of the PLC Aries based on the OwenCloud service, June 2019. Completed (Looking for Link)
HOTEL, Golden, Apple

Creation of a monitoring system for irrigation at an agrotechnical complex for growing crops. v.Aprelevka. OWEN PLC100 + Masterskada v.3.10. A bonus to work was a website for analyzing indicators based on the OwenCloud service, April 2019. Completed

Tenzometria

Programming the system of middle and upper level SCADA. Clean rooms. Zelenograd Masterskad v.3.10. Development of a driver for working with EBMPAPST protocol. Dispatching ventilation systems. April 2019 Completed
EBM

Programming the top-level system SCADA for FBU Sanatorium Voronovo. Masterskad v.3.9. Moscow. Control and accounting of production and distribution of natural water. August 2018 Completed

2018-11-06_21-11-50.png

Organization of works, commissioning, programming of SCADA iFix dispatching system modernization in combination with power cells of RZA EKRA. Vostochny Moscow in May 2018. Completed

Mosvodokanal

Programming, installation, commissioning for the creation of application software for PLC110-60 and panel SP307 (Aries). city of Zelenograd. Multi-apartment house. April 2018 Completed

ИТП многоквартирного дома

Programming, installation, commissioning works on modernization of system of supply of diesel fuel for the stand of testing of turbojet engines. Dzerzhinsky. Horizon. 2017. Completed.

Gorizont

Programming and commissioning works on the residential area of automation. “Smart home”. Tower “Moscow”. Beckhoff CX8090 + Crestron. 2016. Completed.

Moscow City

  Commissioning works on introduction of solid radioactive waste transport system. PLC Premium Schneider Electric. 2016. Completed.

KUR AES

Autoroad party playground. Istra. Mosk. region. Programming, configuration of equipment, installation and commissioning works on the project site kontravariynoy production. Siemens equipment – TP1900, TP700, PLC 315-DP / DN + 8 ET200S, Scalance. TIA Portal V13 + Step7 Professional V5.5. May-June 2016. Completed.

GAI

Implementation of software for plasma-treating furnace waste. OWEN PLC 110+ HMI Weintek MT8100IE. Moscow, 2015. Completed.

Plasmotron

Modernization (design and commissioning) woodworking machine CNC (end tenor). Five axes management software. The upper level of WinCC, the lower Delta.

Shiporez

Design automation systems 1200 sq.m private buildings on the basis of controllers WAGO. Creating a centrally-distributed system using an industrial protocol Modbus TCP. Integration bus DALI, internet stuff, multimedia.

Barviha. Smart Houme

The system loading washer fluid (filling stations). Aries PLK110 (fast inputs, counters). 2015. Completed.

Fresh liq

Modernization of dispatching air handling unit apartment complex garage complex “Cheryomushki”. Aries PLK110 operates a network PLC WAGO, ventilation. 2015. Completed.

Parking

STG (Pulp and paper industry APCS) “Semibratova.” Designing, programming and commissioning of cogeneration of thermal modules. WAGO / B & R / Siemens / Beckhoff. Completed.

Semibratovo

Warehousing near d.Leshkovo. Completed.

Leshkovo

The development of combustion systems for solid radioactive waste from nuclear power plants. Completed.

Rostov AES

The ventilation system of main ventilation Soligorsk “Krasnoslobodsky mine”. SIEMENS-MITSUBISHI. Completed.

HOWDEN

Starting work on the crane drilling ship “ISPOLIN.” Completed.

Ispolin

Designing and conducting commissioning work on the installation of gas-factional HFC-300. Almetyevsk. Completed.

GFU300

Dispatching control systems hotel building “Gazprom” company Computrols.Inc. Completed.

Gazprom